All divisions

DIVISION 02

MEP

Mechanical and electrical — coordinated, installed, witnessed, handed over.

The division

MEP is the permanent home of our mechanical and electrical capability.

Nine sub-divisions are designed as system teams in two groups, Mechanical and Electrical, each around a discipline-lead seat that owns the standard the work is built to. The division is led by a founding partner, the Chief Technology Officer. The sequence starts with design coordination: risers, plant rooms and cable routes are fixed on coordinated drawings before the structure is cast, so shafts and systems are agreed while a change is still cheap. Every commitment then sits in one system of record — submittals, hold points, witnessed tests — and that trail becomes your handover dossier.

After handover, the same team provides planned and round-the-clock maintenance of the building services.

9 sub-divisions

The MEP share of the company's 19 specialist sub-divisions.

2 system groups

Mechanical and Electrical, each around a discipline-lead seat that owns the standard.

Saudi Building Code 2024

The electrical, mechanical, energy-conservation and plumbing volumes — and SEC distribution requirements.

What the two groups install

Two groups, nine system teams. Every scope line below sits inside a family of activities registered on the company's commercial registration — the family is named on each card. A registered activity is a registration, not a licence, and we say so.

Mechanical

Cooling, water and drainage, sized to the load and balanced at commissioning.

Registered activity families G and C — mechanical, HVAC and plumbing installation; water and sewer networks

  • HVAC — cooling and air-conditioning systems, air-handling units and ducting
  • Ventilation and pressurisation — extract, make-up air and staircase pressurisation
  • Plumbing and drainage — sanitary fixtures, water supply and internal drainage piping
  • Pumps and water systems — booster and transfer pumps, storage tanks and irrigation piping
  • Heating and process piping — heating systems, gas and steam piping where the specification calls for them
  • External water and sewer networks — distribution mains and stations, storage towers, sewer network works
  • Balancing, flushing and witnessed testing of every mechanical system before handover

Electrical

Power from the incoming supply to the last socket, with the protection around it.

Registered activity families F, C, G and H — electrical and low-current installation; distribution and standby; solar; earthing and lightning protection

  • LV power distribution — switchboards, distribution boards and cable networks
  • Containment and routes — cable trays, trunking, conduits and busbar risers
  • Lighting — internal, external and emergency lighting systems
  • Earthing and lightning protection
  • Standby generators and automatic changeover — connection, changeover panel and load priorities
  • Solar PV networks — array, inverters and the tie-in to the distribution boards
  • Insulation, continuity, earth-loop and functional tests witnessed and recorded before energisation

The code we build to — and the work we do not offer

Executed to the Saudi Building Code 2024 — its electrical, mechanical, energy-conservation and plumbing volumes — and to SEC distribution requirements

  • Electrical work follows the code's electrical volume and the distribution requirements of the Saudi Electricity Company; the supply arrangement is fixed with the authority before switchboards are ordered.
  • Mechanical work follows the mechanical, energy-conservation and plumbing volumes: equipment selected against the calculated load, duct and pipe sizing, insulation, and the drainage rules that decide the shafts.
  • Solar photovoltaic networks are quoted inside power and distribution — array, inverters and the tie-in to the distribution boards — not as a separate package.
  • Equipment is submitted against the specification and the inspection and test plan before an order is placed; a substitution is approved in writing or not installed.

Fire-protection, fire-alarm and vertical-transport systems are coordinated with Civil Defense-licensed specialists

Those systems require a Civil Defense contractor licence, which the company does not hold, so we do not offer them. We coordinate them — shaft and route reservations, builder's work, power supplies, and the interface back to our systems — while the licensed specialist installs and obtains the statutory approval. Name them in your enquiry and get who-does-what in writing before award.

Testing and commissioning is not a final week. Each system is tested as it is completed and witnessed against the inspection and test plan. Results are recorded system by system and handed over as one dossier.

Past projects

The division's past-work pages come with its projects; this page carries its scope and standards.

See all projects

Send us the tender drawings and bill of quantities

You get a priced package with one name accountable for it.

Talk to us